Oxford plant shutdown for 14 days?
Oxford plant shutdown for 14 days?
The dealer said they have a 2 week shutdown at the production line coming up, or at least his allocations showed a two week gap in the production runs. Perhaps they are trying to push some cars through early (by moving up some orders) to beat the shutdown. Perhaps some of these cars are "taking cuts" in line.
How did you get from a quote that the plant was shutting down for 2 weeks, which is the regular summer shutdown for the plant when everyone goes on holiday, to the thread title that the plant is shutting down for 60 days?
What thread is this Quote from?? I'm not inclined to believe this info. The Google Searches I've done show some earlier dates in regards to slow downs NOT actual closings. Except for the re-introduction of the MINI to the US. These have been related to changes in manufacturing procedures ie. Paint and body style differences.
oh hell.....my bad. i meant 14 (fourteen) days. i was posting from the capcom games office and i was probably thinking about something else at the time.
math and video games don't mix.
and if you click on the blue arrow next to the original poster's quote, it'll bring you to the thread it was from.
and i don't know jack about UK except from the food/concert venues/tv from my band days. so i apologize for being ignorant if they have an awesome 2 week vacation.
EDIT: i just contacted a mod to change the number in the title. sorry for any heart attacks i may have caused.
Last edited by steaming79; Apr 15, 2008 at 08:14 PM. Reason: added info
Trending Topics
Thread
Thread Starter
Forum
Replies
Last Post
M7Speed
1st Gen Countryman (R60) Talk (2010-2015)
0
Sep 4, 2015 10:47 AM
M7Speed
R50/R53 :: Hatch Talk (2002-2006)
0
Sep 3, 2015 07:48 AM



Yikes. Well I hope everyone got their orders in before then...
