Production week 45 2015 Thread
Strange that my car shows up in WW's tracking system since it is on a NYK-Line ship. Its possible there are other NYK-Line ships leaving for Port Hueneme before the 19th. I would check the tracking every couple of days and see what you get.
If anyone is interested my car's original booking reference was GBSOU1381958. Now it is GBSOU1381958A. Almost every car that made it onto the Sagittarius Leader was built week 44.
Hmm, another NYK-Line on the around the world route (Southampton->San Diego->Port Hueneme) is arriving soonish (Nov 17). The Auriga Leader is not listed as being on this route but the Southampton VTS shows its next destination is San Diego. There is a chance it will pick up some MINIs.
Last edited by eno; Nov 12, 2015 at 08:44 AM. Reason: typo
Probably won't show anything until the ship arrives. I checked mine daily and it didn't show a ship until the 11th. Probably won't be updated again until the 16th or 17th.
Hoping mine will be booked on the Auriga Leader. The ship is on its way to Bremerhaven to pick up BMWs and MINI Countryman now. After that it is Emden then Southampton. Wish it would show up on Premiership's page so I could see when it is scheduled to get to Port Hueneme.
Though it probably doesn't matter since it looks like they may delay delivery of my car until after Dec 14 anyway so I get it after the dealerships officially launch the Clubman. Go figure.
Manon is showing up on the Southampton VTS planned movements:
MANON 9179725 Vehicle (MVE) SGP 19-Nov-2015 07:30 Nab Zeebrugge 38/9 S 1.00 227.90 15150 WALLENIUS WILHELMSEN LOGISTICS
MANON 9179725 Vehicle (MVE) SGP 19-Nov-2015 19:00 Nab 38/9 Manzanillo(PAN) S 1.00 227.90 15150 WALLENIUS WILHELMSEN LOGISTICS
The Manon is currently en route from Malmo to Bremerhaven. The Auriga Leader is in Bremerhaven now.
MANON 9179725 Vehicle (MVE) SGP 19-Nov-2015 07:30 Nab Zeebrugge 38/9 S 1.00 227.90 15150 WALLENIUS WILHELMSEN LOGISTICS
MANON 9179725 Vehicle (MVE) SGP 19-Nov-2015 19:00 Nab 38/9 Manzanillo(PAN) S 1.00 227.90 15150 WALLENIUS WILHELMSEN LOGISTICS
The Manon is currently en route from Malmo to Bremerhaven. The Auriga Leader is in Bremerhaven now.
Cool!
My ship has been out of range the last couple days. It's weird after getting updates every day or two for the last couple weeks, to have it be in silent mode now. Feels sort of like NASA mission control when a spaceship looses communication as it orbits the dark side of the moon. Fingers crossed that everything is going OK. LOL.
My ship has been out of range the last couple days. It's weird after getting updates every day or two for the last couple weeks, to have it be in silent mode now. Feels sort of like NASA mission control when a spaceship looses communication as it orbits the dark side of the moon. Fingers crossed that everything is going OK. LOL.
Cool!
My ship has been out of range the last couple days. It's weird after getting updates every day or two for the last couple weeks, to have it be in silent mode now. Feels sort of like NASA mission control when a spaceship looses communication as it orbits the dark side of the moon. Fingers crossed that everything is going OK. LOL.
My ship has been out of range the last couple days. It's weird after getting updates every day or two for the last couple weeks, to have it be in silent mode now. Feels sort of like NASA mission control when a spaceship looses communication as it orbits the dark side of the moon. Fingers crossed that everything is going OK. LOL.
Looks like the Manon is sitting out at sea right now. Hasn't headed into port at Zeebrugge for some reason.
Last edited by eno; Nov 17, 2015 at 12:18 PM. Reason: typo
Once my car gets to the dealer, they have to install the JCW Pro Suspension, JCW Pro Splitters, and have all the trim pieces (grille surround, head/tail rings, belt line, and gas cap) painted black. I'm guessing my car won't be ready for about 3 or 4 days AFTER it gets to the dealer. I'm thinking it should be ready for delivery the 20th or 21st. Then it's off to get tinted.
Merry Christmas to ME!
How far from the VDC is your dealer?
Once my car gets to the dealer, they have to install the JCW Pro Suspension, JCW Pro Splitters, and have all the trim pieces (grille surround, head/tail rings, belt line, and gas cap) painted black. I'm guessing my car won't be ready for about 3 or 4 days AFTER it gets to the dealer. I'm thinking it should be ready for delivery the 20th or 21st. Then it's off to get tinted.
Merry Christmas to ME!
Once my car gets to the dealer, they have to install the JCW Pro Suspension, JCW Pro Splitters, and have all the trim pieces (grille surround, head/tail rings, belt line, and gas cap) painted black. I'm guessing my car won't be ready for about 3 or 4 days AFTER it gets to the dealer. I'm thinking it should be ready for delivery the 20th or 21st. Then it's off to get tinted.
Merry Christmas to ME!


The only thing I can think of, is that maybe it's in some sort of holding pattern as to not arrive in Zeebrugge early?
Must be. Looks like Zeebrugge is pretty full right now. Hope she doesn't have to sit doing donuts for too long.



