F55/F56 Expected wait at VDC with port-installed options
Expected wait at VDC with port-installed options?
Hello all....my first foray into the Mini world is currently at the VDC (work order opened 1/29). I have the JCW Tuning Kit, CF mirrors/intake and the black lined headlights/taillights being installed. I imagine the tuning kit will take the most time, but anyone have insight or anecdotes on whether their car arrived at the dealer on the estimated date or it took longer because of PIA?
Thanks!
Thanks!
Last edited by Pertplus; Feb 2, 2016 at 02:24 PM.
I had sport stripes installed at the port and it took an extra 2 days, but it really depends on how backed up the VDC is. 2-3 days is probably an accurate estimate on days spent in VDC if you're getting parts installed (depending on what they are of course).
Thread
Thread Starter
Forum
Replies
Last Post
Mini Mania
Drivetrain Products
1
Jan 30, 2016 09:17 AM
Mini Mania
Drivetrain Products
0
Jan 6, 2016 10:48 AM



